中文  |  English
Project
Marine and Offshore Engineering
Vessel and Ship
Offshore Performance Table
Ship Performance Table
Site:Index > Project > Scarabeo 9
Scarabeo 9
The Sixth Generation Semi-Submersible Drilling Platform DP3
Shipowner: Saipem
Shipyard: Yantai CIMC Raffles Offshore LTD
Scope of Supply: HVAC&Ref. Systems
Contract Signing Time: January, 2007
 

General Description:

"Scarabeo 9" is the sixth generation semi-submersible drilling platform. Its working depth 3048 m, into the DNV classification society. The platform's owner is Saipem, services in the Gulf of Mexico, hanging the flag of Liberia. Its length 115.0 m, molded breadth 78.0 m, pipe rack deck height 42.4 m, float length 110.0 m, width 16.0 m, high-11.6m, column length 16.0 m, width 16.0 m, high 22.0 m, the upper platform length 74.0 m, width 74.0 m, pipe rack deck length 77.0 m, width 78.0 m, working draft 23.6m, displacement 52 932 t. Working environment temperature -20 ℃ ~ 40 ℃, water temperature 0 ℃ ~ 35 ℃. Normal work under 70 kn wind speed and at  14.5 m wave height circumstance.

Scope of Supply:
Detailed design, three-dimensional harmony, production design, procurement, manufacturing, duct installation, project management, offshore commissioning and maintenance for HVAC and refrigeration systems

 


 
Contact Us
Tel: 021-63185528
Fax: 021-63185399
Add: 7F, No. 567 Zhonghua Road, Shanghai 200010 China
Email: info@cadarmarine.com
Index | About | Products | Ability | Case | Partners | Job
Copyright(C) 2011      ICP备案号06019386
Replica watches